Step 3: Prepare the Stainless Steel Chimney Liner Start by using your razor knife and remove the plastic wrap that the liner is coiled in. Turn jam nut an additional 14 turn with wrench to secure. Add Tip Ask Question Comment The flue sections are each several times longer than the height of a block, so you only need to lay a single tile for every two or three courses of blocks. Be sure to include weep holes between the block at the bot-tom of the chimney and the top of the fireplace that extend out through the facing. Socket type joints and self aligning joints are available in round flue liners. See Also: How To Build a Barrel Stovehttps://youtu.be/Adnt9fxaPHQBoot: Search Amazon forhigh temp silicone chimney boot Key Features. Ensure that the size and fitment is correct and that it completely covers all of your flue holes (if you have multiple) and that it fits around the chimney structure itself. Clean the interior of the chimney flue using an electric drill and flue brush on an extension shaft. Once you have the liner out, start to straighten the liner. Your flue kit (that can be purchased from a home supply store) will provide you with a string that will allow you to insert the sheets inside the chimney, attaching it to the cap. Superior Clay manufactures a complete line of vitrified clay flue liners from 3 to 36 diameters in round flue liners and from 4x8 to 24x24 in square and rectangular flue liners. Take measurements for the length, width, and height of the chimney's flues. square step flashing to fit 1-1/2 in. Keep pushing the rope through the chimney until your helper has received it at the other end. Lower the liner down into the chimney until you reach the thimble (hole on the side of the chimney). Keep in mind that the cap should have pre-drilled screws so that you know where the screws will go. The 6-in-dia. Leave at least 6" of space. square frame to hold the chimney support bucketthe ceiling fixture that carries the inside end of the chimney. The flue is then sealed with a band that should be included in your kit. Step seven: Feed the liner down to your helper. Generally suitable for all types of gas fires. The flue is flush with the mortar chimney top, so there is nothing to clamp a standard chimney rain cap onto. Drill pilot holes into the marks with a masonry bit attached to a hammer drill. Lock top chimney dampers are economical and are designed for any do-it-yourself homeowner to install. - Measure the diameter of the appliance flue outlet. Suitable for solid fuel fires. Place the chimney cap over the flues and on the crown. Make a wavy bead of caulk 1 inch wide around the edge of the crown. Place a section of ceramic flue tile into the hole in the center of the blocks. A new chimney liner costs between $900 and $7,000 to install or $2,500 on average. Select the chimney and either DVL or DuraBlack connector stovepipe with the same size diameter as the appliance flue outlet. Seal the chimney crown with silicone caulking. Step 1. Step 2 - Access Roof. To install a slide-in single flue cap: Push it down into the chimney flue until tight. How can I attach a rain cap to the flat top of the chimney? You'll then insert the flue liner, lowering it down inside of the flue itself. If you instal a chimney liner into an existing chimney, be sure to get the chimney cleaned first as this will ensure there is no residual soot or other obstructions that could create difficulties with the installation. Drill pilot holes in the chimney crown using a masonry bit that is an inch smaller than your screws. If possible, plan your flue location to fall between the building's ceiling joists and the rafters. Start by using your knife and remove the plastic wrap that the liner is. If necessary, cut the top of the liner with your tin snips to equal 4 inches (10.2 cm) higher than the chimney crown. Center the cap onto the crown. A chimney is, on the other hand, in its simplest definition, the housing that encases the flue. Have enough pipe so it extends higher than any other pipe or vent in the roof. Once you have purchased the cap, climb on the roof and place the chimney cap on top of the flue, pressing down on it until it sits properly. Take your new chimney cap out of any packaging or container and carefully place it over your chimney crown. 2. Spread canvas drop cloths on the floor in front of the fireplace. Secure the flue tile in the mortar bed by tapping it with the handle of the trowel. Install the liner with the arrow pointing upwards. Drill pilot holes into the crown through the holes on the cap. Make sure to do this on the grass or a soft surface so you don't puncture it. Clay or cast-in-place chimney relining costs $2,000 to $7,000. I can't find any rain caps that don't clamp onto the sides of the flue. Flue liner material prices range from $6 to $120 per linear foot. The arrow on the liner indicates the direction of the smoke. Buy a chimney cap that will fit your dimensions. Use an electric chipping hammer to remove some brick from the rear wall of the fireplace. The roof flashing may be the hardest part to installing a chimney pipe for a wood burning stove. It might take a bit of twisting and turning to get it through. A lock top chimney damper has a gasket at the top of the chimney to ensure an air tight seal every time. Step 3: Place New Cap. pipe requires a 1214-in. Next, secure the cap using screws and a drill machine. Mount the roof and set the cap over the flues and onto the crown. Lock top chimney dampers also act as a rain cap, keeping rain and critters out of your chimney. Extend the tape measure to find the total combined length of all the flues. 20 Instruct the second person to hold the bottom connector into place. However, there must be a minimum of 6' of flue in order to use a chimney pot. The brick portion is about 2' x 4', and it has an 8" x 8" tile flue in the center. For fireplace installations, refer to the sizing chart in the back of the . around the front corner as shown. Chimney Pots may be added to the top of outdoor fireplaces. Lay out the sheets, and then roll them so that they are slightly smaller than the chimney space. Step 5. To install, position the chimney cap where you want it to be on the chimney crown and conform the flange to the chimney crown. Fit a power drill with a masonry bit that is 1/8 inch smaller than the installation screws. The cost to replace a stainless steel chimney liner is $900 to $3,800. On the roof, the pipe is connected and assembled to six feet tall according to the pitch of the roof. These types are fastened with an adhesive or masonry bits. Position safety device wire corner-to-corner and re-tighten dome nut onto end of bolt. They make sure it's plumb, centered, sealed at the joints and secured to the roof. Usually has an internal chimney breast of up to 15 (375mm) deep. Superior manufactures flues with holes, contoured flue rings, and flue. Check for at least 6 inches between the flue and the top of the cap to allow for proper ventilation. Steps for Installing a Chimney Liner and Damper. This ensures that any condensation and Insert chimney liner down the flue: The part that goes down the chimney first is the vertical part of the tee connection attached to the liner. Buy the flue pipe you want to install. Get free estimates from chimney liner installers near you or . Make sure you leave at least 6" of space between the top of the flue and the cap. Embed the corner step flashing in the caulk and nail it to the roof with two roofing nails. Place the end of your tape measure against the side of the flue, which is the clay or metal tube coming out from the top of your chimney. In this video I will show you how to properly install a chimney pipe and explain why.#kevinrobinson6688 #InstallChimneyPipe #ChimneyPipeSELKIRK DSP8TL 8" Tel. Purchase double-wall or triple-wall pipe for a wood stove. Place a few screws along the edge of the sheet, and screw it in tightly. Opening Size is normally a 36 x 36 (375mm x 375mm) opening with a lintel above and can be closed down to a 16 x 22 (400 x 550mm) opening. This video shows a basic stove top installation.The top plate is going to be the main variable for a chimney liner kit. Rotate/twist the liner whenever you're stuck. Snip and bend a piece of prebent 8-in. From the roof, insert the stainless . To install a bracketed, screwed, or clamped cap: Slide the cap over the flue and push down until fairly tight. Step 2 - Installing the Flue Next, you will have to create the flue out of the metal sheets. Follow local building codes and have your chimney inspected by a certified professional. Holding the chimney cap firmly in place, drill through the predrilled holes in the flanges and into the chimney crown with the 3/16 masonry bit. If the cap is secured with masonry screws, mark out the screw hole locations onto the crown. How To Install A Chimney Cap On A Double-Flue Chimney? Complete the installation when the bottom connector has reached the appropriate position for your chimney height. Step 1: Ceiling Work. Ultimately, you want some liner poking out of the chimney stack and some poking out of the fireplace. If not, attempt to reach the chimney using a ladder from ground level. Scrub clean the crown with a stiff-bristle brush. A flue is the channel, pipe, or tube through which gases and smoke travel from a source of combustion (fireplace, furnace, boiler) to the outside environment. Step 3: Clean and Apply Silicone to Chimney Flue Once you've firmly established your footing on the roof you'll need to clean off the top of the chimney flue. The chimney cap's screen must be placed at least 5 inches above the tallest flue opening. Nobody wants a leaky roof or the damage it could cause to yo. If you can reach the chimney from the rooftop, installing the cap should be fairly easy. This type of pipe has a second or third pipe running along the outside as shielding from the amount of heat that can pass through it. Apply a jelly bean-size dollop of caulk at the corner where the chimney meets the roof. If the cap is secured with adhesive, mark the outside perimeter of the cap that contacts the crown. Straighten the liner out as best as you can.